热门标签

皇冠正网代理开户(www.hg108.vip):Fukushima debris removal delayed by another year

时间:4周前   阅读:9

皇冠正网代理开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠正网代理开户的平台。皇冠正网代理开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP,提供皇冠正网代理开户、皇冠正网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

telegram采集群组www.tel8.vip)是一个Telegram群组分享平台。telegram采集群组包括telegram采集群组、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。telegram采集群组为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:澳洲幸运5开户(www.a55555.net):1 killed, 4 hurt after car plunges into sea

下一篇:telegram华人群(www.tel8.vip):UN session on high seas biodiversity ends without agreement

网友评论